1.Avoid installation in environments with high temperature, direct humidity, or direct sunlight. 2.Ensure unobstructed pipe connections. 3.The outer frame of the installed unit should protrude 2mm from the ceiling surface initially. After applying putty and paint, it must be flush with the ceiling, with no recessing or protruding. 4.After installation and power-on, the VOV logo will light up. lf it fails to light up, troubleshootingis required immediately.
コミッショニング
目的プロフェッショナルな引継ぎ体験を提供し、ブランド価値を強調する。.
システムの試運転
1.Avoid installation in environments with high temperature, direct humidity, or direct sunlight. 2.Ensure unobstructed pipe connections. 3.The outer frame of the installed unit should protrude 2mm from the ceiling surface initially. After applying putty and paint, it must be flush with the ceiling, with no recessing or protruding. 4.After installation and power-on, the vOV logo will light up. lf it fails to light up, troubleshootingis required immediately.